Freeport Street, Phase II

Freeport,TX

Reconstruction of Freeport Street from IH 10 to Holly Park from an existing 2-lane asphalt pavement with open ditch/small lateral culvert system to 2-lane with continuous left turn lane, concrete curb and gutter and storm sewer system. Storm sewer system included three offsite systems, a new HCFCD concrete low flow channel, and upgrading numerous HCFCD channel crossings all to alleviate occurrence of 1% (100-yr.) flooding in the neighborhood area.

 
Scroll to Top