North Fort Bend Water Authority
RGME assisted with the design of 10,400 LF of 12″, 16″, 20″ and 24″ diameter water lines and appurtenances, preparation of bid and construction documents and the construction phase services.
RGME assisted with the design of 10,400 LF of 12″, 16″, 20″ and 24″ diameter water lines and appurtenances, preparation of bid and construction documents and the construction phase services.
The North Main Siphon consisted of one 42-inch reinforced concrete (RCP) siphon pipe with supporting headwall structures at each end. This existing 42-inch RCP siphon was extended downstream by 60 linear feet to accommodate the expansion of North Main Street pavement widening project by the Harris County Public Infrastructure Department (HCPID) and the City of […]
This project consisted of the design and construction of the San Jacinto River Authority Ground Water Reduction Program Project C-4. C-4 is a 24-inch waterline from Old Egypt Road (connection to C-2) to the City of Conroe Water Plant 15 and connection to C-3. The line was placed along FM 830, under IH 45 and […]
Enter your email address to subscribe to our newsletter.