Project Description

Responsible for the 4R P.S.&E. roadway design of approximately one (1) mile new location controlled access 4-lane urban toll road including frontage roads and entrance/exit ramps. Design supervision responsibilities include roadway geometric design, Typical Sections, and proposed roadway cross sections, Hydraulic Analysis, detention pond, storm sewer design, traffic control plan, signing, pavement marking and channelization, as well as, preparation of plans, estimates and quantities.

  Add to Favorites

Project Details

Date February 24, 2015 Categories Author RG Miller